![]() ![]()
![]() As a single point of contact for these challenges, only PFEIFER could give answers to all this different open points.” #PFEIFER SEIL UND HEBETECHNIK GMBH MEMMINGEN SKIN#It pays always in such a complex project to involve a one-stop-shop company from the very beginning on a consulting fee basis: This is a common way of working in the United States but not yet established in Europe.”Īdded Mihaylov, “Secondly, with our wide span of services – Tension Members Fabrication, Membranes and Foils Fabrication, Retractables development, engineering and design, PFEIFER was the sole construction company to have in-house all elements of the most critical elements in the stadium structure: The long span cable net, the unique single layer roof skin and the movable pictures frame to support the climate engineering, and last but not the least, and very important for the business case of Stan Kroenke was the integration of LED in the transparent roof skin and transforming the roof to the biggest media display in the world. ![]() Jassen Mihaylov, Head of Tension Members and Head of Lightweight Architecture, PFEIFER Structures, Germany, stated that two important factors led to PFEIFER becoming part of the SoFi Dream-Team – “First, the Design Assist, our support to engineers and architects in making the structure doable in engineering – the right material in the right place and having in mind the budget. Image: Pfeifer Seil- und Hebetechnik GmbH #PFEIFER SEIL UND HEBETECHNIK GMBH MEMMINGEN FULL#PFEIFER landing the SoFi Stadium deal was not a business/cost decision, but full credit goes to its Design Assist factor as well as the company’s wide span of services. To enable this, production ran in three shifts.įor the 302 ethylene tetraflurorethylene (ETFE) panels, PFEIFER procured 60 tonnes of ETFE membrane, printed it and, after printing, cut, assembled and welded it. This meant that quantities of rope and weight had to be channeled through production in record time that would otherwise not have been manageable in a normal business year. Twenty-three kilometers of pre-assembled steel cables had to be on site 12 months after the contract was inked. However, the SoFi stage goes beyond that. For PFEIFER, while being engaged in the roof work of SoFi Stadium, time was at a premium and looming deadlines are a common factor in almost all construction projects. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |